Construction of Al-Madinah Al-Munawwarah / Al-Ula / Tabuk Expressway (Phase 1) (Section located in Al-Madinah Al-Munawwarah region)


  • Ministry of Transport and Logistics
  • SAR 77,000,000
  • 06/ July/2011
  • 22/ June /2016

Scope of Work:

A 6 km long expressway consisting of four lanes in each direction, including the construction of an intersection and ramps. Additionally, the project includes drainage structures and safety measures.
Al Mardoof earthworks machinery in Madinah

Project Data Highlights

Number of Links

1

Total length of Links
6 KM
Total Quantity of Cuts
3,108,310 M3
Total Quantity of Fills
906,653 M3
Total Quantity of Asphalt
65,000, M3
Total Quantity of Concrete
12,054 M3
Total Quantity of Steel
1,973 Ton
Total Quantity of Road Paint
7,645 M2
Total Number of Cat Eyes
4,619 Pcs
Total Quantity of Road Signboard
52 M2