Construction of Al-Madinah Al-Munawwarah / Al-Ula / Tabuk Expressway (Phase 2) (Section located in Al-Madinah Al-Munawwarah region)

  • Ministry of Transport and Logistics
  • SAR 140,000,000
  • 24/09/2012
  • 04/08/2018

Scope of Work:

A 4.4 km long expressway consisting of four lanes in each direction, including an intersection, five bridges, and six ramps. Additionally, the project includes drainage structures and safety measures.
Al Mardoof earthworks machinery in Madinah

Project Data Highlights

Number of Links

8

Total length of Links
14 KM
Total Quantity of Cuts
3,014,469.00 M3
Total Quantity of Fills
1,449,067.00 M3
Total Quantity of Asphalt
93,430.00 M3
Total Quantity of Concrete
27,280 .00 M3
Total Quantity of Steel
3,350 .00 Ton
Total Quantity of Road Paint
11,163 .00 M2
Total Number of Cat Eyes
6000 Pcs