- Ministry of Transport and Logistics
- SAR 125,125,000
- 08/08/2009
- 22/07/2013
Scope of Work:
- Dualization of a section of the Al-Ula/Khaybar road, including the airport entrance intersection, with a length of 12 km, along with safety measures.
- Construction of the Farad’a/Bulayti’h/Al-Thalfa agricultural road, with a length of 23 km, including safety measures.
- Dualization of a section of the Al-Ula/Hijr road, with a length of 23 km, including safety measures.
Project Data Highlights
Number of Links
3
Total length of Links
42 KM
Total Quantity of Cuts
705,213 M3
Total Quantity of Fills
1,704,302 M3
Total Quantity of Asphalt
129,428 M3
Total Quantity of Concrete
27,664 M3
Total Quantity of Steel
3,731 Ton
Total Quantity of Road Paint
38,353 M2
Total Number of Cat Eyes
19,182 Pcs
Total Quantity of Road Signboard
1,500 M2